Process plant, and anything with continuous control loops. On a discrete machine the FDS sequence section usually covers it, and a separate narrative is duplication you will have to keep in step.

What is in it

  1. 01Process overview
  2. 02Equipment description
  3. 03Control loops
  4. 04Normal operation
  5. 05Start-up and shutdown
  6. 06Upset conditions
  7. 07Operator responsibilities

Written by

Process engineer with the control engineer

Approved by

Process owner

Written against

  • ISA-5.1 for instrument identification
  • ISA-88 for procedural terminology

Preview

Control-Narrative.md
# Control Narrative
## {{PROJECT_NAME}}

| | |
|---|---|
| **Document title** | Control Narrative (CN) |
| **Document number** | {{DOC_NO}} |
| **Revision** | {{REV}} |
| **Date** | {{DATE}} |
| **Project** | {{PROJECT_NAME}} |
| **Client** | {{CLIENT}} |
| **Prepared by** | {{AUTHOR}}, {{COMPANY}} |

### Revision history

| Rev | Date | Description | Author | Approved |
|---|---|---|---|---|
| 0 | {{DATE}} | First issue | {{AUTHOR}} | |
| | | | | |

### Approval

| Role | Name | Signature | Date |
|---|---|---|---|
| Author | {{AUTHOR}} | | |
| Reviewer (engineering) | | | |
| Approver ({{COMPANY}}) | | | |
| Approver ({{CLIENT}}) | | | |

---

## 1. Process overview

[Describe what the plant makes, and how. Write it so a new operator could read this section
alone and understand what they are looking at on the plant floor. Avoid control system
vocabulary here entirely.]

---

## 2. Equipment description

| Tag | Equipment | Function | Rating |
|---|---|---|---|
| [P-101] | [Feed pump] | [Transfers feed from T-101 to R-201] | [m3/h, kW] |
| | | | |

---

## 3. Control loops

One subsection per loop. The measurement, the final element, the strategy, and, importantly,
what the loop is protecting against.

### 3.1 [FIC-101, feed flow control]

| Item | Detail |
|---|---|
| Measurement | [FT-101, magnetic flow meter, 0 to 50 m3/h] |
| Controller | [FIC-101, PID] |
| Final element | [FCV-101, equal percentage, air to open] |
| Normal setpoint | [value and units] |
| Setpoint source | [Operator entry / recipe / cascade from LIC-201] |
| Action | [Direct / reverse, and why] |
| Failure position | [Fail open / closed / last, and the consequence of each] |

**Description.** [Prose: what the loop does, when it is in automatic, what an operator should
expect to see, and what it means when the valve sits at 100 percent.]

**Tuning.** [Initial values, and a note on the dominant time constant.]

---

## 4. Normal operation

[The steady state. What the operator watches, what the normal ranges are, what routine
interventions are expected during a shift.]

---

## 5. Start-up and shutdown

### 5.1 Cold start
[Numbered, in order, including the checks that must pass before each stage.]

### 5.2 Normal shutdown

### 5.3 Emergency shutdown
[What trips, in what order, and what stays running. State explicitly which items remain
energised, because that is the question the maintenance team will ask first.]

---

## 6. Upset conditions

| Condition | Symptom | Cause | System response | Operator action |
|---|---|---|---|---|
| [High level in T-101] | [LAH-101 alarm] | [Outfeed blocked] | [Feed pump stops] | [Investigate outfeed] |

---

## 7. Operator responsibilities

[What the operator is expected to do, and, just as usefully, what they must not do. If there
are actions that require a permit or a second person, say so here.]